Europaudvalget 2002-03
EUU Alm.del Bilag 309
Offentligt
1461135_0001.png
Modtaget via elektronisk post. Der tages forbehold for evt. fejl
Europaudvalget
(Alm. del - bilag 309)
udenrigsministerråd
(Offentligt)
_____________________________________________
MPU, Alm. del - bilag 278 (Løbenr. 6508)
Medlemmerne af Folketingets Europaudvalg
og deres stedfortrædere
Bilag
1
Journalnummer
400.C.2-0
Kontor
EU-sekr.
3. december 2002
Til underretning for Folketingets Europaudvalg vedlægges forslag til rådsbeslutning: Tillægsbeslutning
77/270/Euratom, der giver Kommissionens beføjelse til at yde Euratomlån med henblik på bidrag til
finansiering af nukleare energiinstallationer, COM(2002) 456 final.
PDF to HTML - Convert PDF files to HTML files
1461135_0002.png
COMMISSION OF THE EUROPEAN COMMUNITIES
Brussels, 6.11.2002
COM(2002) 456 final
2002/0246 (CNS)
Proposal for a
COUNCIL DECISION
amending Decision 77/270/Euratom empowering the Commission to issue Euratom loans for the purpose of
contributing to the financing of nuclear power stations
(presented by the Commission)
EXPLANATORY MEMORANDUM
1. Legal foundation of Euratom lending
The Euratom lending instrument was established by Council Decision 77/270/Euratom of 29 March 1977 empowering the
Commission to issue Euratom loans for the purpose of contributing to the financing of nuclear power stations (the
"Establishing Decision") in Member States.
The ceiling for borrowing to fund Euratom lending was originally fixed by Council Decision 77/271/Euratom of 29 March
1977. Subsequently, the ceiling was raised by various amendments of that Decision, the latest of which (Council Decision
90/212/Euratom of 23 April 1990) increased it by 1 000 million ECU to 4 000 million ECU .
PDF to HTML - Convert PDF files to HTML files
1461135_0003.png
The scope of the Euratom lending instrument was extended by Council Decision 94/179/Euratom of 21 March 1994
amending Decision 77/270/Euratom, to authorise the Commission to contract Euratom borrowings in order to contribute
to the financing required for improving the degree of safety and efficiency of nuclear power stations in certain non-member
countries (the "Scope Extension Decision").
In particular, in Article 1 the Commission is
"… empowered to contract …… borrowings, the proceeds of which will be allocated in the form of loans to finance
projects to increase the safety and efficiency of the nuclear power stations of the non-member countries listed in the
Annex."
and efficiency of nuclear power stations in certain non-member countries (the "Scope Extension Decision").
The non-member countries defined by the Annex to the above Decision are: the Republic of Bulgaria, the Republic of
Hungary, the Republic of Lithuania, Romania, the Republic of Slovenia, the Czech Republic, the Slovak Republic, the
Russian Federation, the Republic of Armenia and Ukraine. The list includes some candidate countries for accession to the
Community.
2. Borrowing and Lending Ceiling
An adjustment to the borrowing ceiling will be proposed separately to the Council.
3. Consolidation of the Decisions
The purpose of the present Proposal is to consolidate the set of Decisions referred to above for the following reasons:
• To ensure that there is equal treatment of current and future Member States after their accession.
• To ensure that safety and efficiency issues remain important criteria for the eligibility of projects
• To ensure that decommissioning projects within the Community are explicitly eligible under certain conditions.
• To ensure that priority is given to projects related to improving nuclear safety and efficiency of installations in service
or under construction and to the decommissioning of installations.
The Establishing Decision and the Scope Extension Decision both had Guidelines associated to them. This proposal to
amend the Establishing Decision (as amended by the Scope Extension Decision) is accompanied by a proposal to merge
these Guidelines and to introduce some modifications as detailed below.
Where relevant, the existing statements referring to the organisation of cooperation with the EIB and the Member States’
participation (via the Economic and Financial Committee) and the other statements attached to the Establishing Decision
and the Scope Extension Decision remain valid.
4. Euratom Participation in a Project
Under the Guidelines associated to the Scope Extension Decision (i.e. for certain non-member countries),
"The Commission will limit its loans to 50% of the total cost of the projects"
and
"The total Community financing for a particular project will not exceed 50%."
Under the Establishing Decision (for Member States), this participation is limited to 20%.
It is proposed that the 20% limit be maintained for new investment in the existing and new Member States after accession as
defined in the Establishing Decision, whereas no such participation will be available for non-member countries. Further, it is
proposed that the maximum participation of Euratom (i.e. 50%) for a project of a safety and efficiency nature, including for
completion, (all as defined in the Scope Extension Decision for certain non-member countries) be extended to apply to
similar projects within the Community.
5. Decommissioning
PDF to HTML - Convert PDF files to HTML files
1461135_0004.png
Under the Guidelines associated to the Scope Extension Decision, (i.e. for certain non-member countries), a
decommissioning project is specifically eligible:
"Projects may also relate to the decommissioning of installations for which modification to bring them up to standard is
not feasible in technical or economic terms and which would pose a safety hazard if simply abandoned."
under certain conditions:
"The financing of decommissioning measures will be considered only where no provision to finance these measures has
been made during the operating life of the installation."
Since, in addition to countries outside the Union, the enlarged Union will also soon need to address decommissioning
challenges, it is proposed that the Guidelines be modified to make clear that such projects within the Community be eligible
for Euratom finance. Further, to enable the intervention of Euratom in such projects (both within and outside the
Community), it is proposed that the reference to the availability of decommissioning finance is clarified so that t he financing
will be considered "only where no adequate provision to finance these measures has been made during the operating life of
the installation, especially if it is to be shut down earlier than originally envisaged."
For linguistic reasons a technical adjustment is proposed in item 2.4.4.3. of the Guidelines
6. Conclusion
The proposals made herein will allow an enhanced flexibility in the application of Euratom finance, as it is oriented towards
projects that address, in particular, the real concerns of nuclear safety and decommissioning in Europe. Individual projects
will continue to be examined on their particular merits within the Guidelines and will require specific Commission approval.
The Commission is of the opinion that nothing in the Guidelines annexed to the draft Council Decision would require a
formal classification. It further proposes that these Guidelines shall be included as an annex to the Council Decision.
2002/0246 (CNS)
Proposal for a
COUNCIL DECISION
amending Decision 77/270/Euratom empowering the Commission to issue Euratom loans for the purpose of
contributing to the financing of nuclear power stations
THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty establishing the European Atomic Energy Community, and in particular Articles 1, 2, 172 and
203 thereof,
Having regard to the proposal from the Commission,
Having regard to the opinion of the European Parliament,
Whereas:
(1) Council Decision 77/270/Euratom has empowered the Commission to issue Euratom loans for certain purposes
concerning non-member countries.
(2) Nuclear energy has to be seen as part of overall energy options within the Community as well as outside.
(3) The accession to the Community of some countries listed in the Annex to Decision 94/179/Euratom should not lead
to an unjustified difference in the treatment, under the Euratom financing instrument, of new Member States with respect
to the existing Member States, or vice versa.
(4) The decommissioning of existing nuclear installations is becoming an issue equally important within the Member
States as in the countries listed in the Annex to Decision 94/179/Euratom.
(5) The issue of the safety of nuclear installations within the Member States is as important as it is in those countries.
PDF to HTML - Convert PDF files to HTML files
1461135_0005.png
(6) Priority should be given to projects related to nuclear safety and efficiency of installations in service or under
construction, as well as to the decommissioning of installations.
(7) Decision 77/270/Euratom should therefore be amended accordingly,
HAS DECIDED AS FOLLOWS:
Sole Article
Article 1 of Decision 77/270/Euratom shall be replaced by the following:
"Article 1
The Commission is hereby empowered to contract, on behalf of the European Atomic Energy Community
(Euratom), and within the limits fixed by the Council, borrowings, the proceeds of which will be allocated in the
form of loans to finance, within the Community, investment projects relating to the industrial production of
electricity in nuclear power stations and to industrial installations in the nuclear fuel cycle. The Commission shall
also be empowered to contract, within the same lim its, borrowings, the proceeds of which will be allocated in
the form of loans to finance projects to increase the safety and efficiency of the nuclear power stations within
the Member States or the non-member countries listed in the Annex to Decision 94/179/Euratom. For these
projects to be eligible they must:
- relate to nuclear power stations or installations in the nuclear fuel cycle which are in service or under
construction, to fuel and material testing reactors that are necessary for safety and efficiency improvements or to
the dismantling of installations where modification cannot be justified in technical or economic terms,
- have received all the necessary authorisation at national level and in particular the approval of the safety
authorities,
- have received a favourable opinion from the Commission in technical and economic terms.
The Commission may borrow only within the limits of loans requested of it.
The borrowing and corresponding lending operations shall be denominated in the same monetary unit and
carried out under the same conditions as regards repayment of the principal and interest payments. Costs
incurred by the Community in concluding and executing each operation shall be borne by the recipient
undertakings."
The provisions in the Annex form an integral part of this Decision.
Done at Brussels,
For the Council
The President
ANNEX
GUIDELINES
The Council invites the Commission to observe the following guidelines, which the Commission has agreed to adopt for
the borrowing and lending operations that it carries out pursuant to Council Decision 77/270/Euratom, as amended.
1. BORROWING
1.1. The costs of arranging loans must be the same as those paid by prime issuers, and the Commission will
take all measures necessary to ensure that Euratom loans enjoy the same favourable terms as other
Community loans.
1.2. Bearing in mind the nature of the investments which the borrowing is intended to help finance,
maturities must be as long as market conditions permit; should the undertakings concerned so require, short
or medium-term loans may also be arranged.
1.3. Repayment programmes must, wherever possible, provide for periods of grace.
PDF to HTML - Convert PDF files to HTML files
1461135_0006.png
2. LOANS
2.1 Euratom loans can be granted for two types of projects:
◦ For new investments in Member States
◦ For safety and efficiency in Member States and eligible non-member countries
2.2 Priority shall be given to projects related to safety and efficiency of installations in service or under
construction, including decommissioning of installations.
2.3. FOR NEW INVESTMENTS IN MEMBER STATES
2.3.1. Acceptability of requests
From the point of view of energy policy, the Commission will grant loans only for projects of which it has been notified in
accordance with the investment notification procedure provided for in Articles 41 et seq. of the Euratom Treaty and which
have been approved by the Commission, particularly in the light of the aims of the Community’s energy and environmental
policies.
From the financial point of view, the Commission, taking into account the results of the examination of the loan application
carried out by its agent, will grant loans only:
• after checking the financial soundness of the undertaking and, in particular, after examining its balance sheet;
• on the basis of first-class guarantees, for example:
• security in the form of real property, conservatively valued, and subject to negative covenants,
• guarantees by first-class banks or private guarantees of the same value,
• assignment of revenue from long-term electricity supply contracts,
• public-sector guarantees, if any.
Where appropriate, several guarantees may be combined.
No distinction will be made between the two types of guarantee (public- or private-sector) as regards
priorities or the conditions under which loans will be granted.
However, should it appear during or after the examination of the loan application that, when the usual
banking criteria are applied, private guarantees would not be sufficient to cover all the risks of the project,
the Commission must require a public guarantee for the grant of the loan.
2.3.2. Ceilings for loans
(a) The Commission will grant loans only to supplement those which the undertaking concerned must obtain
elsewhere.
(b) The Commission will in principle limit its loans to 20% of the total cost of a project (in one or more
instalments).
2.3.3. Loan grant sequence
(a) Consideration will be given to requests for the financing of investment costs submitted after 1 January
1976 and relating to projects for which firm orders were placed after 1 January 1974.
(b) Funds will be borrowed to the extent required by the applications which the Commission has agreed to
approve.
(c) Other factors being equal, the Commission will give special consideration to projects involving several
Member States.
2.4. FOR SAFETY & EFFICIENCY (Member States and eligible non-member countries)
PDF to HTML - Convert PDF files to HTML files
1461135_0007.png
2.4.1. Technical and economic acceptability of applications
2.4.1.1. Types of project involved
The projects must give priority to improving the safety and efficiency of nuclear power stations and
installations in the nuclear fuel cycle which are in service or under construction (see points 2.4.1.2
and 2.4.1.3). To this end, projects concerning the construction or improvement of Fuel and Material Testing
reactors could be eligible.
Projects may also relate to the decommissioning of installations for which modification to bring them up to
safety requirements acceptable to the EU is not feasible in technical or economic terms and which would
pose a safety hazard if simply abandoned. The financing granted may relate to investment during the period
between shutdown and the start of decommissioning and to the decommissioning measures themselves. The
financing of decommissioning measures will be considered only where no a dequate provision to finance
these measures has been made during the operating life of the installation, especially if it is to be shut down
earlier than originally envisaged.
2.4.1.2. Obtaining authorisation at national level
Financing will be granted only to projects that have received the approval of the competent national
authorities, particularly the safety authorities.
2.4.1.3. Obtaining a favourable opinion from the Commission in technical and economic terms
(a) At technical level, the Commission will (with the support of experts from the Member States in the case
of projects in the eligible non-member countries) examine the extent to which the project provides a solution
to the safety problem which exists. The examination will also include an assessment of the environmental
impact of the project.
For projects in the eligible non-member countries, the Commission's examination will refer to the studies on
nuclear safety carried out by the international bodies, IAEA and WANO, and under the PHARE and TACIS
programmes, and will, with the support of experts from the Member States, assess the project in comparison
with measures implemented in the Member States to solve similar types of problem, taking account of the
recommendations made by the international bodies.
Although the list below is not exhaustive, the Council invites the Commission to give particular
consideration to the following modification measures:
◦ improving the containment of the primary circuit (reactor vessel and primary piping);
◦ improving the reactor cooling system, particularly the emergency cooling system;
◦ fire detection and extinguishing systems;
◦ installation of specific and independent alarm systems;
◦ improving the reactor protection and monitoring system;
◦ control room equipment.
Other measures resulting from the studies under way will also be taken into consideration.
(b) At economic level, the Commission will establish that the projects are justifiable, by comparing the
economic characteristics and the efficiency of the projects in question with those of non-nuclear alternatives
that are potentially available. Investment must relate to installations that are economically viable. The
opinion will refer to the overall energy plan that has been defined for the recipient country, insofar as such
guidelines exist.
The economic and efficiency studies will be based on assumptions which reflect the reality of a market
economy in terms of both the positive financial flows (price and quantity produced) and the negative
financial flows (investment costs, cost of factors utilised, etc.).
PDF to HTML - Convert PDF files to HTML files
1461135_0008.png
(c) For projects in the eligible non-member countries, the Commission will establish regular contacts with
the EBRD, with which it will seek to promote the closest possible mutual co-operation.
2.4.2. Necessity of close co-operation with at least one Community enterprise
This condition will be considered to have been met if a major proportion of the capital goods item or service that is to be
financed is provided by a Community enterprise.
2.4.3. Securities
For projects in the eligible non-member countries, the guarantee of the State on whose territory the project is situated will be
required and the Commission will ensure that in prudential terms the securities obtained are equivalent to those provided for
in operations within the Community.
Where appropriate, other first-class securities will also be contemplated.
For projects in Member States, guarantees will be required as described in 2.3.1 above.
2.4.4. Limits of loan amounts
2.4.4.1. The Commission will grant only loans that supplement those which the enterprise has contracted with other
parties.
2.4.4.2. The Commission will limit its loans to 50% of the total cost of the projects mentioned in point 2.4.1.1 (in one or
several tranches). The total Community financing for a particular project will not exceed 50%.
2.4.4.3. In the event of co-financing with the EBRD, the cumulative total together with Community financing will under
no circumstances exceed 70% of the total cost of the project mentioned in point 2.4.1.1.
2.4.5. Order of granting of loans
2.4.5.1. Applications concerning the financing of expenditure effected after 1 July 1992 will be acceptable.
2.4.5.2. The Commission will use the technical and economic studies to decide, if necessary, which projects are to
receive priority treatment.
2.4.6. Other financing conditions
2.4.6.1. Currencies
Loans will be paid out in several currencies (a combination) or in a single currency, according to the recipient's
preferences and subject to availability. The main currencies used will be those of the EC Member States, the Euro, the
US dollar, the Swiss franc and the yen.
2.4.6.2. Duration
Loans will be granted on a medium and long-term basis, with the particular duration depending on the type of project
and life of the assets financed. The maximum duration of loans will be twenty years.
2.4.6.3. Interest rates
The interest rates will closely follow the cost of the borrowings from which the loans are granted, and they will not vary
according to the nature or location of the project, nor according to the type or nationality of the recipient. Rates will be
set for each of the currencies used.
The loans will be at a fixed or variable rate, according to the recipient's preferences and subject to availability.
2.4.7. Reimbursement
Reimbursement of the loans will be carried out in line with reimbursement of the borrowings utilised. Reimbursements
will be made in the same currencies and in the same proportions as the loan disbursements.
The Decision and the present guidelines are without prejudice to the provisions of the EC- and Euratom-Treaty.
PDF to HTML - Convert PDF files to HTML files
1461135_0009.png
These guidelines replace the guidelines recorded in the minutes relating to Council Decision 77/270/Euratom and the
guidelines recorded in the minutes relating to Council Decision 94/179/Euratom.